Location: Costa Verde Health Services Republic of Panama, Province of West Panama, La Chorrera District, Puerto Caimito District, Costa Verde Urbanization, Las Acacias Street, Globo B, Macrolote, Macrolote 1N-1A Panama
Type of project: New Building — Hospital
Status: Under Construction — Preliminary EDGE Certificate obtained
Execution period: 2025 — 2027
The Costa Verde National Hospital is a newly built private hospital, located in Costa Verde, Panama City, designed as highly complex health equipment aimed at comprehensive patient care. The project consists of 10 levels above ground and 2 levels below ground, and an approximate capacity of 200 beds, integrating general and specialized hospitalization areas, ICU, operating rooms, diagnostics, consultations, therapy, administrative areas and complementary services.
Since its inception, the project incorporates criteria of operational efficiency and sustainability, aligning hospital infrastructure with international environmental performance standards. The building is located registered in EDGE certification in the Post-Construction phase, validating that the design and construction strategies were effectively implemented on site
What makes this project innovative?
The main innovation of the Costa Verde National Hospital lies in integrating a highly resource-demanding hospital program with a comprehensive certified sustainability strategy, something rare in large scale health buildings in the region.
The project meets and exceeds EDGE standards with the following global results
Together, these strategies generate an annual reduction of ∼120 operational tCO₂ and ∼1,586 tCO₂ of incorporated carbon, positively impacting more than 35,000 people per year who use the building.