FITWEL CERTIFICATION IN GUATEMALA

In Zona 10 contact centers, turnover is measured in months. The workplace is part of the answer

Certify your project
Leaf Global
>
Fitwel Certification
>
Guatemala

What is happening with Fitwel certification in

Guatemala

Guatemala City has become one of Central America's main hubs for contact centers and shared services, with a young, bilingual workforce that companies fight over. Any operations manager knows the problem: long shifts in front of a screen, short breaks with nowhere real to rest, fast food as the only option, and turnover that forces nonstop recruiting and training. Add commutes of over an hour along the Periférico or Calzada Roosevelt, and a country that lives with earthquakes and volcanic eruptions. Fitwel, created by the U.S. CDC and GSA, certifies that the building tackles those causes of burnout: decent break areas, drinking water, healthy food, inviting stairs, lactation rooms and clear emergency protocols. For BPO operations, corporate offices in Zonas 10, 14 or 15 and multinationals with regional headquarters in Guatemala, it's a verifiable way to show that caring for the team goes beyond talk.

01
Lower turnover in high-intensity operations: break areas, restorative spaces and wellbeing policies certified by Fitwel address some of the most commonly cited reasons people quit contact centers and shared services.
02
Healthy food at work: Fitwel rewards healthy food and beverage policies in cafeterias and vending machines, a concrete improvement over fast food as the only option during long shifts.
03
Earthquake and eruption preparedness: Fitwel's safety category includes documented emergency, evacuation and first-aid plans, essential in a country with frequent seismic and volcanic activity.
04
A global standard international clients expect: U.S. and European companies outsourcing to Guatemala increasingly assess their vendors' working conditions, and Fitwel is a credential they understand immediately.

What are the steps to get certified?

Assessment: we evaluate the building or operation against the applicable Fitwel scorecard, focusing on break areas, cafeterias, hydration and emergency protocols.

Registration and strategy: we register the project with Fitwel and set the target level, from one to three stars, together with operations and HR teams.

Implementation: we coordinate break areas, water stations, stairs and lactation rooms, and draft policies on healthy food, smoke-free spaces and emergencies.

Certification: we submit the documentation, secure the seal valid for three years and set up the recertification plan.

Over 300 projects worldwide

Explore more projects

Costs and timelines?

Fitwel charges a registration fee and a certification fee per building or space, with special terms for portfolios. Since it doesn't require on-site performance testing, the total cost is well below WELL's. Physical investment usually focuses on break areas, cafeterias, water stations, stair signage and lactation rooms. The process takes 4 to 8 months, and certification is valid for three years.

Read more about Fitwel certification

Fitwel v3:
what you need to know

+ see more

WELL vs Fitwel: key differences for corporate offices

+ see more

Complete guide to sustainable certifications: Fitwel, EDGE, LEED, WELL, BMS

+ see more

How can we help you?

Leave us a message and we will get back to you.

Contact us

Does Fitwel apply to a 24/7 contact center?

material-symbols:add-circle-rounded

Yes. Fitwel applies to all kinds of workplaces, and in round-the-clock operations its strategies on break areas, hydration, healthy food available on every shift and safety have an especially visible impact on staff.

Can we certify only the floors our operation occupies in a building?

material-symbols:add-circle-rounded

Yes. Fitwel has a commercial interior space scorecard designed for tenants occupying one or more floors without controlling the whole building.

How long does Fitwel certification take in Guatemala?

material-symbols:add-circle-rounded

For an existing building or space, 4 to 8 months on average. The pace depends on internal approval of wellbeing policies and on any physical upgrades needed.

62434fa732124a389912aad8_linkedin%20small.svgig_logo

Leaf Global. Copyright © 2026. All rights reserved.